• International System Est.
  • P. O. Box 30943. Al-Jubail, Kingdom of Saudi Arabia

Projects

# Clients Services Provided
1 SAUDI KAYAN / SABIC Construction and Commissiong of Reactor 3
2 SAUDI KAYAN / SABIC Oxygen Injection for BP Compressor
3 PETROKEMYA / SABIC Upgrade Speed and Anti Surge Controller
4 PETROKEMYA / SABIC Installation of Local Panel for Demin
5 ABQAIQ / ARAMCO Air Compressor System Upgrade
6 YANPET / SABIC CCC Yanpet Controller
7 SABIC / SHARQ Mechanical Governor to Electronic Governor
8 UNITED / SABIC Fire & Gas Upgrade
9 PETROKEMYA / SABIC Installation and commissiong of Ammonia Gas Detectors
10 JUYMAH / ARAMCO Compressor Control Upgrade
11 ADVANCED System Upgrade
12 Khursaniyah / ARAMCO System Upgrade
13 SABIC GAS Antisurge Controller Upgrade
14 PETROKEMYA / SABIC CCC csd Migration Project
15 SIPCHEM Feasabilty Study of 3 Compressor
16 SHARQ / SABIC SHARQ Cable Laying in 1EG Plant
17 SHARQ / SABIC Provision of Gas detection in ground flare area in olefin plant
18 YANPET / SABIC Upgrade of Compressor K7701A/B/C/D
19 SAFCO / SABIC Installation of Orifice Type Differential Pressure Transmitter
20 SAFCO / SABIC Provide Sample Line PH Analyzer at Common Line to RC
21 SAFCO / SABIC Installation of LEL and Toxic Gas Detectors in 3EG and Olefin Plant
22 SAFCO / SABIC Upgrade of Pneumatic Transmitters to Electronic Type in 1UTL
23 PETROKEMYA / SABIC To provide Online Analyzer with Hooter and Beacon for O2 in Analyzer House
24 PETROKEMYA / SABIC Replacement of Dammaged Conduit in B-8 Area
25 PETROKEMYA / SABIC Compressor Panel Repair
26 SADAF / SABIC Obsolete Gas Detectors Replacement
27 HADEED / SABIC Replacement of Damaged Conduit in VCM Plant
28 SABIC Hadeed Replacment of Obsolete Burners for Boilers
29 SAFCO / SABIC Installation of Temperature Gauges in UPS and Substation
30 HADEED / SABIC Manpower Support for SPLP Project
31 SABTANK / SABIC Upgrade of Obsolete VMS system for Propane Refrigeration Compressors
32 SAFCO / SABIC SF2 to Provide 2 additional level switches on 1-S-451 & 1-S-452 in 2oo3 voting logic to trip 1-K405
33 SAFCO / SABIC Replace the switch 3-LSLL-403 in dearator with SIL certified magnetrol915P and to add 2 more Switches - Safco, SF2
34 HADEED / SABIC CRM Burners Enhancement Project at HADEED
# Clients Services Provided
1 SAFCO / SABIC Installation of Proximity Probe Based Continous Monitoring System
2 SHARQ / SABIC 1 & 2 PE Reactor Improvement Project
3 SHARQ / SABIC Modification of 2 & 3 Utility Pressure Switches
4 SHARQ / SABIC PE 1 & 2 Re Do Hazop Recommendation Phase I
5 PETROKEMYA / SABIC Replacement of Damaged Conduit in VCM Plant
6 YANPET / SABIC EG-1 ESD Upgrade, Instruments+ PLC Replacement
7 IBN ZAHR / SABIC Upgrading 200-T-002 Starting Device in Ibn Zahr Plant
8 Riyadh Refinery / ARAMCO Control System Upgrade
9 ABQAIQ / ARAMCO Upgrade of Existing CCC S4 to S5M
10 JUYMAH / ARAMCO Upgrade of Existing CCC S4 to S5M
11 Qatif South GOSP / ARAMCO Upgrade of Existing CCC S4 to S5M
12 NATPET S3+ to S3++ Upgrade
13 YANPET / SABIC Analzers Obsoelence Upgrade
14 YANPET / SABIC Acrison Controllers Upgrade
15 PETROKEMYA / SABIC Re-Tubing of Poly valves
16 PETROKEMYA / SABIC Instruments Relocation along Poly reactors
17 SIPCHEM PLC Upgrade of Three Compressor
18 Tanajub / ARAMCO S3+ to S3++ Upgrade

Awards