Upgrade of ESD System along with associated Field Instruments in EG Unit and Constructing New UPS Shelter |
SABIC / Yanpet |
Upgrade of 74 Obsolete Analyzers |
SABIC / Yanpet |
Design, Engineering , Procurment, Installation and Commissioning of Control System for 5 Instruments Air Compressors Along With Related Field Instruments Replacement |
SABIC / Ibn Zahr |
Design, Engineering, Supply, Procurement, Installation and Commissioning of Emergency Diesel Generator Sets (4 Nos.) in UTL & Admin Area |
SABIC / PetroKemya |
Upgrade of Instrument Air Compressors at QWIP |
Aramco QWIP |
Upgrade CCC S4 to S5M in BGP |
Aramco Berri |
Design, Engineering, Procurment, Installation and Commissioning of 3 ITCC System for 3 Trains in Ar Razi II Plant |
SABIC / Ar Razi |
Upgrade of Instruments Air Compressors Control System (K7701 A/B/C/D) |
SABIC / Yanpet |
Revamp of LEL and Toxic gas Detection System on OLF and 3 EG Plants |
SABIC / Sharq |
Upgrade of Instruments Air Compressors Control System and Vibration System along with associated Field Instruments |
Saudi Aramco / Abqaiq |
Upgrade Control systems of CPF Gas Compressors in Qatif |
Saudi Aramco / Qatif |
Design, Engineering and installtion of Interlock System on DPG Reactor |
SABIC / Yanpet |
Retorfit of Mechniacal Governor to Electronic Governor for Steam Turbine |
SABIC / Sharq |
Retrofit of Obsolete Anti Surge Contorl System in GAS Phase 1 , 2 & 3 |
SABIC / GAS Yanbu |
Improvement in PHE Isolation Valves in UTL-1 Seawater Service |
SABIC / Ibn Zahr |
Upgrade of Acrison Weighing Controllers and Honeywell CLM |
SABIC / Yanpet |
Construction and Commissiong of Reactor 3 |
SABIC / Saudi Kayan |
Upgrade of Penumatic Transmittesr to Smart Electronic Transmitters Type in UTL 1 Plant |
SABIC / Sharq |
Reactor Instrumentation Improvements in 1 & 2 PE Plants |
SABIC / Sharq |
Retrofit of ABB Anti Surge Controller |
SABIC / GAS Jubail |
RIS Redesign Recommendation For Modification of 2 & 3 UTL Plants Pressure Switches |
SABIC / Sharq |
Design, Engineering, Supply, Instalation and Commissioning of Continuous Emission Monitoring System |
SABIC / SABTANK Jubail |
Upgrade Obsolete Woodward Governer To Latest System for 21-K-402 / 403 / 404 |
SABIC SAFCO |
Design, Procurment and Installation of Ammonia Gas Detectors |
SABIC / PetroKemya |
Fire & Gas Detection System Upgrade |
Honeywell (SABIC / United) |
Design, Procurment and installation of Local Panel For DEMIN and MBD D/E/F/G and Commissioning of All The Systems |
SABIC / PetroKemya |
Replacement of 8 Nos. of Obsolete Analyzers Systems |
SABIC / Yanpet |
Upgrade of ATG System for PetroKemya Tanks (4 Nos.) in SABTANK |
SABIC / SABTANK Jubail |
Replace Hydraulic Starting System for 200-T-02 Turbine by Electo-Haydrulic System |
SABIC / Ibn Zahr |
Upgrade of 21 Obsolete MOVs at Plant III & IV |
SABIC / Ar Razi |
Upgrade of Obsolete CRM Burners |
SABIC / Hadeed |
Upgrade Obsolete ELLIOTT PAP Air Compressor Control Systems |
Aramco juaymah |
CCC control system upgrade for 470K-1A/B/C/D |
Aramco Berri |
Upgrade of Turbine Speed Controller and Compressor Anti Surge |
SABIC / PetroKemya |
Upgrade of CCS for Fractionation Compressors |
Saudi Aramco / Juaymah |
REPLACEMENT OF TWO SEAWATER SERVICE CUSTODY METERS |
SABIC / Ibn Zahr |
Upgrade of Vibration Monitoring System for 4 Propane Refrigeration Compressors |
SABIC / SABTANK Jubail |
PLC Upgrade for IAC's for Utility Phase 1 |
SIPCHEM |
Design, Engineering, Procurment and Comissioning of Fire and Gas Systemm for Samsung and Flour Warehouses in Tasnee |
Tasnee |
Upgrade of DCS Interface Boards for MTBE 1 and UTL Plants |
SABIC / Ibn Zahr |
Replacement of Utility Phase 3 Obsolete Control Systems & Common Load Sharing Network for Phase 1, 2 & 3 |
SIPCHEM |
Implementation of Re-Do Hazop Study for PE 1 & 2 Plants |
SABIC / Sharq |
Replacement of Damaged Cable Trays and Conduits in B-8 Area |
SABIC / PetroKemya |
Oxygen Injection for BP Compressor for LDPE Plant |
SABIC / Saudi Kayan |
Two Instrument Air Compressors 51-C-1701A/B Control System Upgrade for Utility Phase 2 |
SIPCHEM |
Upgrade of Anti Surge Controllers for NG / CO & CO2 Compressors |
SIPCHEM |
CCC control system upgrade for 470K-3A/B |
Aramco Berri |
Design, Procurment, Installation and Commissioning of Vibration Monitoring System For Turbines 3TS 501 A & B |
SABIC / SAFCO |
Design, Engineering, Procurment and Comissioning of Fire and Gas Systemm for Spare Parts Warehouse |
Tasnee |
Upgrade of Anti Surge Controller |
SABIC / Yanpet |
Design, Supply, Installation and Commissioning of Level Switches on Ammonia Drums |
SABIC / SAFCO |
Design, Supply, Installation and Commissioning of Level Switches on Dearator Utility Plant |
SABIC / SAFCO |
Replacement of Obsolete LEL Detectors |
SABIC / SADAF |
Design, Procurment, Installation and Commissioning of DP Flow Meter At Gas Line Inlet Connections to SF-2 and SF-3 |
SABIC / SAFCO |
Replacement of Damaged Cables and Conduit in EG1, 2 & 3 |
SABIC / Sharq |
Fesability Study for (CO, NG & CO2) Compressors |
SIPCHEM |
Upgrade Compressors Performance Control System |
Advanced Petrochemical |
Modification on Compressor Local Control Panel |
SABIC / PetroKemya |
To Provide and Installa PH and Conductivity Analyzers at The Common Line of Waste Water to RC |
SABIC / SAFCO |
IbnZahr MTBE 2 S3++ controllers Retrofit |
SABIC/IBN Zahr |
Replacement of Design, detail engineering, supply, installation, testing, calibration & commissioning of 99 analyzers + 4 lab equipment |
SABIC/Petrokemya (N) |
Upgradation of Emergency Deisel Generator |
SABIC/Petrokemya (S) |
Replacement of Sea Water Dublex Strainer |
SABIC/Al Bayrouni |
To Supply & Install pH Conductivity, TOC, TDS and Ammonia Analyzers inside the shelter |
SABIC/Al-Razzi |
Existing TRISEN OSD upgrade at IBN SINA |
SABIC/IBN Sina |
Fire system replacement at Tasnee |
Tasnee |
Replacement of Electrical Cables in PE Plant |
SABIC / PetroKemya |
GE Turbine control sytem Upgrade (GE MArkVI) |
SABIC/IBN Zahr |
Slag Detection system installation |
SABIC/Hadeed |
Oxygen analysers SCS and HVAC |
SABIC/Saudikayan |
Hardware and Software Update for Prognost Monitoring System for PP Extruder Gear Reducer |
SABIC/Saudikayan |
Supply and installation of Liquid Analyzers |
SABIC/Al Bayrouni |
Replacement of BM1 and RM1 Automation Network Switches & Cables |
SABIC/Hadeed |
ISE-P2687-R0 KGP Upgrade obsolete Reliant controllers of Compressor Control System (CCS) for Sweet Feed Gas Compressors KGP compressors |
ARAMCO/Khursaniya |
Supply of CCS for Aramco Berri Abu Ali GOSP |
ARAMCO-HWL/Abu Ali |
CCC S3++ controllers spares for Tanajib |
ARAMCO/Tanajib |
CCS system for Marjan Field Development |
ARAMCO-Emerson/Marjan |
CCC Site services for Aramco Safaniya 747 project |
ARAMCO-HWL/Safaniya |
Maintanance service contract |
ARAMCO/ABQAIQ |
Jafurah Utilities Sulfur and Interconnecting Systems (JFGP-2) Project |
ARAMCO-Yokogawa/Jafoura |
CCC site services for Aramco RT Clean Fuel project |
ARAMCO-HWL/Rastanura |
CCS for Dew Point Control Facilities – Abqaiq DPCU |
ARAMCO-Emerson/Abqaiq |